How soon must an inspector perform a rough inspection after being notified?

Study for the Massachusetts Master Plumbing Exam. Maximize your preparation with tailored multiple-choice questions and detailed explanations. Ensure your success!

An inspector is required to perform a rough inspection within two days of being notified. This timeframe is critical as it ensures that the construction process can continue without unnecessary delays while also allowing the inspector to evaluate the work completed up to that point. Adhering to this timeframe helps maintain project schedules and ensures compliance with relevant building codes and regulations.

Choosing a longer period, such as three or five days, could disrupt the workflow of the construction project and potentially lead to increased costs or complications from delays. Conversely, requiring the inspection to occur within one day may not be feasible for all inspectors due to scheduling constraints and the number of inspections they must conduct. The two-day requirement strikes a balance between efficiency and practicality in the inspection process.

Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy